News

  • Online E-Billing Services

    Our online e-billing portal is now up and fully operational.

    Residents can access the portal using the following link: Click Here to Access Portal

    Thank you for your patience while maintenance was being completed. If you experience any issues accessing the portal, please contact our office for assistance.

  • The LV Community Grant Intake Two Opens September 1st!

    Eligible community organizations are welcome to apply for up to $2500 in support from the Township of Laurentian Valley.

    The deadline to apply is October 1st, 2026, at 4 pm

  • Notice of Construction - Stafford Third Line

    The Township of Laurentian Valley advises that our Public Works division will soon be making road improvements in your neighborhood. This project includes the rehabilitation of Stafford Third Line.

    The project involves the rehabilitation of the roadway and drainage improvements which 
    include the following works:
    - Full depth reclamation of the asphalt road surface
    - Replenishment of granular road base material
    - Ditching works where required
    - Repaving of the roadway
    - Shouldering of the new roadway

    To accommodate crossroad culvert replacements, sections of Stafford Third Line will be 
    closed daily from 7am to 7pm, August 25th to August 28th, weather dependent with no 
    through traffic, including emergency vehicles in the work area. Detour will utilize Stafford 
    Second Line and School House Road. Civic addresses 2401 to 2569 can be accessed 
    from Stafford Second Line or School House Road. The remainder of Stafford Third Line 
    is not affected by this closure.

    There will be no change to garbage and recycling collection services, except for August 25th. On August 25th, items must be placed at curb no later than 6 am. The Collection Contractor is aware of the upcoming work.

  • Notice of Construction - Forest Lea Road

    The Township of Laurentian Valley advises that our Public Works division will soon be making road improvements in your neighborhood. This project includes the rehabilitation of Forest Lea Road.


    The project involves the rehabilitation of the roadway and drainage improvements which include the following works:

    • Full depth reclamation of the asphalt road surface
    • Replenishment of granular road base material
    • Ditching works where required
    • Repaving of the roadway
    • Shouldering of the new roadway

     

  • Township of Laurentian Valley and the City of Pembroke - Joint Special Council Meeting August 24, 4:30 PM

    Township of Laurentian Valley and the City of Pembroke

    Public Notice

    Please be advised that a Township of Laurentian Valley and the City of Pembroke Joint Special Council Meeting has been scheduled for Monday, August 24, at 4:30 p.m. in Council Chambers. Part of the meeting will be closed to the public for training as it relates to the Sportsplex Facility Project Education Session.

     

  • NOTICE - Temporary Road Closure - Zanders Road

    TEMPORARY ROAD CLOSURE NOTICE - Zanders Road
    Please be advised of a Temporary Road Closure within the Township of Laurentian Valley. Effective Thursday August 20, 2026, at 7am, Zanders Road is closed between B Line Road and Doran Road CR26 for a crossroad culvert replacement.


    Civic addresses between 1 to 109 can be accessed from B Line Road. Civic addresses 110 and up can be accessed from Doran Road.No through traffic, including emergency vehicles, will be permitted in the work area which is located between 109 and 110 Zanders Road.

    It is anticipated that the road will reopen Thursday August 20, 2026, by 7pm.

  • Kids Adventure Dash Results

    On Friday, August 14th, we hosted the 2026 Kids Adventure Dash at Hugli’s Blueberry Ranch, and what an incredible day it was! Every participant gave it their all, showed amazing determination, and had a blast along the way. We’re so proud of all the kids who took part and made the event such a success.

    Congratulations to everyone who raced! Here are the official results from the 2026 Kids Adventure Dash:

    Kids Adventure Dash Results 2026

  • Notification of Construction Activities - Hwy 148 Rehabilitation

    Please be advised that Thomas Cavanagh Construction Ltd. (TCCL) is scheduled to transition to 
    a Staged Construction Configuration beginning Wednesday, August 19, 2026, at 7:00 a.m. As part of this transition, the travel lanes along Pembroke Street East (Hwy 148) will be shifted 
    southerly onto the previously constructed temporary asphalt widening.

    Motorists and pedestrians are asked to exercise caution and follow all posted signage, pavement 
    markings, and temporary traffic control measures while travelling through the construction area. 


    Thank you for your understanding and cooperation. 

Subscribe

Contact Us

Township of Laurentian Valley
460 Witt Road
Pembroke ON K8A 6W5

Phone613-735-6291
Fax: 613-735-5820
Emailinfo@lvtownship.ca