All roads under the Township of Laurentian Valley’s jurisdiction are under load restrictions (half loads) from March 1 to May 31 annually except for the road included in the list below. Although Township By-Law states that load restrictions run from March 1 to May 31, the Township may shorten or extend the time frame, dependent on weather.

2020 Load Restrictions are Lifted as of May 11, 2020

Road Name

From

To

TV Tower Road

Round Lake Road (CR58)

71 TV Tower Road

Forest Lea Road

Doran Road (CR26)

1406 Forest Lea Road

Long Lake Road

Round Lake Road (CR58)

Popkie Road

Popkie Road

Long Lake Road

91 Popkie Road

Witt Road

Highway 41

543 Witt Road

Robinson Lane

Highway 148

Dead End (entire roadway)

Fibreboard Drive

Whitewater Road (CR24)

Dead End (entire roadway)

Matthews Avenue

Pembroke Street West (CR51)

TV Tower Road (CR36)

Achray Road

Algonquin Trail (former railway)

Township Boundary with Town of Petawawa